We have successfully completed a modern factory project with a total construction area of 26,300 m² for Beyçelik Oto Yan Sanayi A.Ş., a major player in the automotive supply industry. This project forms the basis of a strategic and functional facility that meets the high standards of the automotive sector, covering the entire rough construction process from the foundation to the steel structure.
Construction Process and Application Details
Foundation and Ground Preparation: At the beginning of the project, the necessary excavation and filling works were carried out meticulously to ensure the building could withstand heavy industrial loads. Reinforced concrete foundations were poured to ensure structural integrity and durability. At this stage, all insulation works were completed thoroughly to ensure the foundations were long-lasting and protected against external factors.
Steel Construction: The main load-bearing skeleton of the factory building was constructed using steel columns, roof, and facade steel to provide operational flexibility and wide spans. This modern construction technique shortens the project completion time while also facilitating future revisions.
The Beyçelik Auto Parts Factory Project is concrete proof of your company's ability to carry out the rough construction of industrial buildings, meet the highest engineering standards, and offer customized solutions to customer needs. We are proud to have made a significant contribution to the development of the automotive industry with this project.