There are 74 projects.
sort Sort by:
Greenhouse A, Packaging and Service Building, Buffer Tank Construction. Greenhouse B Ground Lime Stabilization and Perimeter Retaining Walls Construction.
Total Construction Area 37,000m² Greenhouse A.
Total Construction Area 4,300m² Offices, Service and Packaging Building.
Total Construction Area 620m² 2 Buffer Tanks
Total Construction Area 42,000m² Greenhouse B Excavation and Ground Lime Stabilization
Approximately 2,000 meters of retaining walls at varying heights
Total 1,200 m³ gabion wall
Total 3,000 meters of Ø80 Fore Piles

Construction of 1 Turbine, Switchyard, Control Building, Access Roads, and Culverts
32,000 m³ excavation and 26,000 tons of fill,
Total Installed Capacity: 6.2MW

Installation of 21 Turbines, Construction of Switchyard and Control Building, Construction of Access Roads
15,285 meters of Ø40 and 880 meters of Ø100 bored piles,
525,000 m³ of excavation and 400,000 tons of backfill,
10,000 m³ of concrete and 2,000 tons of construction steel
Total Installed Capacity: 100MW

Electrical, Mechanical, and Infrastructure Relocation for the Installation of 1 Turbine, and Turbine Foundation Construction and Infrastructure Works
Total Installed Power: 4.8MW
Construction of 2 Turbine Platforms, Foundations, Access Roads, and Culverts
Total Installed Capacity: 6.8MW

Installation of 25 Turbines, Construction of Switchyard and Control Building, Construction of Access Roads
Total Installed Capacity: 104MW

Total Construction Area: 9,000 m²

Total Construction Area: 12,000 m²

Total Construction Area 55,000 m²

Total Construction Area 28,000 m²
5+5 Total Installed Capacity of 10 MW

Fine finishing renovations for the building, 1500m² warehouse, retaining walls, infrastructure, landscaping, and grounds maintenance

Total Construction Area: 36,000 m²

Buseb Inc. in Bursa Free Zone; administrative building, Free Zone Directorate and Customs Directorate administrative buildings, 15 infrastructure transformer buildings, 10,000 m² space roof, steel structure warehouse building, two 5,000 m² space roofs, a steel-framed warehouse building, retaining structures, 30 shops each measuring 300 m², and a customs entrance structure.

Total Construction Area: 13,650 m²

Total Construction Area: 9,850 m²

Total Construction Area 11,631 m²
Total Construction Area: 27,528 m²

Total Construction Area: 2,500 m²

Total Construction Area: 8,700 m²

Total Construction Area: 5,000 m²

Total Construction Area: 7,500 m²

Total Construction Area: 4,000m²

Total Construction Area:18.500m²