There are 86 projects.
sort Sort by:
UMUT İNŞAAT will execute the turnkey construction of the 6,000 m² Osman Sönmez Villa Project, including all structural works, architectural finishing works, structural steel construction, MEP (Mechanical, Electrical & Plumbing) installations, as well as external infrastructure and landscape works, in accordance with applicable engineering standards and project specifications.
Total Gross Construction Area: 14,800 m²
Structural Steel Fabrication & Erection: 450 Tons
Location: Parcel No. 7230/9, Istanbul Anatolian Organized Industrial Zone, Türkiye
Construction of 14 GWH-182-8 MW Turbine Platforms and Foundations, Access Roads, Culverts, and Fire Response Buildings
Total Installed Capacity: 112 MWm / 100.08 MWe Installed Capacity
Construction of 2 Turbine Platforms and Foundations, Access Roads, and Culverts
Total Installed Capacity: 13.8 MW
The Eskişehir Cafer Güven Nursing Home Project has been constructed to accommodate 105 residents, comprising a total of five stories—one basement and four above-ground floors—with a total enclosed area of 6,349 m². As part of the project, advanced structural work, including excavation and backfilling, reinforced concrete, masonry, and megaron roof construction, has been fully completed.
Greenhouse A, Packaging and Service Building, Buffer Tank Construction. Greenhouse B Ground Lime Stabilization and Perimeter Retaining Walls Construction.
Total Construction Area 37,000m² Greenhouse A.
Total Construction Area 4,300m² Offices, Service and Packaging Building.
Total Construction Area 620m² 2 Buffer Tanks
Total Construction Area 42,000m² Greenhouse B Excavation and Ground Lime Stabilization
Approximately 2,000 meters of retaining walls at varying heights
Total 1,200 m³ gabion wall
Total 3,000 meters of Ø80 Fore Piles
Construction of 1 Turbine, Switchyard, Control Building, Access Roads, and Culverts
32,000 m³ excavation and 26,000 tons of fill,
Total Installed Capacity: 6.2MW
Installation of 21 Turbines, Construction of Switchyard and Control Building, Construction of Access Roads
15,285 meters of Ø40 and 880 meters of Ø100 bored piles,
525,000 m³ of excavation and 400,000 tons of backfill,
10,000 m³ of concrete and 2,000 tons of construction steel
Total Installed Capacity: 100MW
Electrical, Mechanical, and Infrastructure Relocation for the Installation of 1 Turbine, and Turbine Foundation Construction and Infrastructure Works
Total Installed Power: 4.8MW
Construction of 2 Turbine Platforms, Foundations, Access Roads, and Culverts
Total Installed Capacity: 6.8MW
Installation of 25 Turbines, Construction of Switchyard and Control Building, Construction of Access Roads
Total Installed Capacity: 104MW
Total Construction Area: 9,000 m²
Total Construction Area: 12,000 m²
Total Construction Area 55,000 m²
Total Construction Area 28,000 m²
5+5 Total Installed Capacity of 10 MW
Fine finishing renovations for the building, 1500m² warehouse, retaining walls, infrastructure, landscaping, and grounds maintenance
Total Construction Area: 36,000 m²
Buseb Inc. in Bursa Free Zone; administrative building, Free Zone Directorate and Customs Directorate administrative buildings, 15 infrastructure transformer buildings, 10,000 m² space roof, steel structure warehouse building, two 5,000 m² space roofs, a steel-framed warehouse building, retaining structures, 30 shops each measuring 300 m², and a customs entrance structure.
Total Construction Area: 13,650 m²
Total Construction Area: 9,850 m²
Total Construction Area 11,631 m²
Total Construction Area: 27,528 m²
Total Construction Area: 2,500 m²