Projects

Rekor Textile Factory Building

Total Construction Area:18.500m²

Bursa, Turkey
Completed 2000

Our company has successfully completed a modern factory building project with a total construction area of 18,500 m² for Rekor Dokumacılık, one of the leading companies in the textile industry. This project is one of the best examples of our ability to construct a turnkey production facility by combining the speed and efficiency offered by prefabricated building systems with high engineering standards.

Construction Process and Application Details

Foundation and Rough Structure: The project began with the necessary excavation and filling work to ensure the factory was built on a solid foundation. Reinforced concrete foundations were poured to withstand heavy industrial loads, and all insulation work was carried out to provide maximum protection against moisture and water damage. The building's main structural framework was quickly constructed using prefabricated columns, roof, and facade steel, significantly reducing the construction timeline.

Facade and Roof Systems: The building's exterior shell was clad with stone wool panels that provide superior thermal and sound insulation, maximizing energy efficiency. Skylights were integrated into the roof to provide natural lighting and energy savings. A modern siphonic system was installed for the rapid and effective drainage of rainwater.

Interior Manufacturing and Functional Areas: Special manufacturing was carried out taking into account the production processes and employee comfort of the facility. Industrial doors were installed for ease of transportation and logistics within the factory, and fire doors were installed for safety. Modern restrooms and changing rooms were completed for the hygiene and comfort of employees. Plastering and painting work was carried out meticulously on all walls.

Flooring and Infrastructure: Special-grade concrete flooring was poured to ensure the factory can withstand heavy traffic and industrial chemicals. General infrastructure needs (clean and wastewater lines) were completed, and the facility's outdoor areas were made functional through landscaping.

Electrical and Mechanical Systems: All technical infrastructure required for the factory's smooth operation has been installed with a focus on efficiency and safety.

Electrical: High-voltage installations, along with strong and weak current lines, were installed to meet the facility's energy needs. Lightning protection, grounding, and fire detection systems were integrated for safety. Emergency announcement and sound systems were installed to prepare for possible emergencies. Generators and installations are also important parts of the structure to ensure uninterrupted energy flow.

Mechanical: The building's comfort systems, including wastewater, clean water, heating, cooling, fire protection, and ventilation systems, have been fully completed.

The Rekor Textile Factory project is proof of your company's ability to construct industrial buildings, effectively use prefabricated systems, and meet the highest technical standards. We are proud to have made a significant contribution to the development of the industry with this project.