Our company has successfully completed an additional factory construction project with a total construction area of 8,700 m² in the Bursa Free Zone for Aunde Teknik, a subsidiary of Orhan Holding, a global leader in the automotive industry. This project was implemented in accordance with our high engineering standards at all stages, from the foundation to the most modern technical infrastructure, in line with the company's goal of increasing its production capacity.

Construction Process and Application Details

Rough Structure and Foundation: Our project began with the necessary excavation and filling work to ensure the building could withstand heavy industrial loads. Reinforced concrete foundations were poured to create a sturdy foundation, and all insulation work was carried out to provide maximum protection against moisture and water damage. The building's main structural framework was constructed using steel columns, roof, and facade steel, which are ideal for wide spans and operational flexibility.

Facade and Roof Systems: The exterior shell of the factory was clad with stone wool panels that provide superior thermal and sound insulation, maximizing energy efficiency. Skylights were integrated into the roof to provide natural lighting and energy savings. A modern siphonic system was installed for the rapid and effective drainage of rainwater.

Interior and Functional Areas: Special manufacturing was carried out taking into account the production processes and employee comfort of the facility. Industrial doors were installed for ease of transportation and logistics within the factory, and fire doors were installed for safety. Modern restrooms and changing rooms were completed for the hygiene and comfort of employees. Plastering and painting work was carried out meticulously on all walls.

Flooring and Infrastructure: Special-grade concrete flooring was poured to ensure the factory can withstand heavy traffic and industrial chemicals. General infrastructure and landscaping work was also completed to make the facility's outdoor areas functional.

Electrical and Mechanical Systems: All technical infrastructure required for the factory's smooth operation has been installed with a focus on efficiency and safety.

Electrical: High-voltage installations and strong and weak current lines were installed to meet the facility's energy needs. Lightning protection, grounding, and fire detection systems were integrated for safety. Emergency announcement and sound systems were installed for possible emergencies. Generators and installations are also important parts of the structure for uninterrupted energy flow.

Mechanical: The building's comfort systems, including wastewater, clean water, heating, cooling, fire protection, and ventilation systems, have been fully completed.

Orhan Holding, this project we have carried out for Aunde Teknik is proof of your company's ability to construct industrial structures for the automotive sector, integrate modern systems, and meet the highest technical standards. We are proud to contribute to the growth objectives of a global brand with this project.